Trinity Business School

Trinity Business School

Dublin

Installation: Supply & installation of all the Passive Fire Protection to the site.

Main Contractors: J.J. Rhatigan

Client: Trinity College Dublin

Description: Description: The new Trinity Business School building will support activities of the TCD School of Business and Innovation and Entrepreneurship. The building is over 11,300m2 with six storeys above ground and two below. It will house a 600-seat auditorium, teaching space and offices and will include restaurant spaces for 200 people. Key features of this innovative and learning centred building are a public space where students can meet and exchange ideas, ‘smart’ classrooms with the latest digital technology, as well as a rooftop conference room and access to a generous green roof space.

Maldron Hotel Development

Maldron Hotel Development

Dublin

Installation: Supply & installation of all the Passive Fire Protection to the site.

Main Contractors: J.J. Rhatigan

Client: Dalata Hotel Group

Description: This project comprises of the design & build of the Maldron Hotel at Kevin Street, including the demolition of the existing factory/warehouse (647m²) and the provision of a 6 storey over basement level building comprising of 150 no. hotel bedrooms with a gross floor area of 6,084m², including a basement level of 1,035m². Also included is the provision of car parking spaces, bicycle parking, all hard and soft landscaping including an ‘al fresco’ dining area at ground floor level.

Richmond Road Mixed Use Development

Richmond Road Mixed Use Development

Dublin

Installation: Supply & installation of all the Passive Fire Protection to the site.

Main Contractors: J.J. Rhatigan

Client: Co-operative Housing Ireland

Description: This project consists of the construction of 39 no. apartments and 2 no. commercial units over basement car parking, and a new pedestrian/vehicular access road from Richmond Road at the North-West end of the site. The works will also include the demolition and removal of the existing ESB – Station, and concrete foot paths and boundaries to the front and rear of the site.

Point Campus

Point Campus

Dublin

Installation: Supply & installation of all the Passive Fire Protection to the site.

Main Contractors: O’Flynn Group

Client: Host

Description: Point Campus is a 966 bed student accommodation development currently under construction and due to be delivered by September 2018 term commencement. The property is a 2.38 acre brown field site that is immediately adjacent to the Gibson Hotel, the Luas red line and the Liffey Trust Centre. It is located on an exceptional site in prime Dublin city centre in the North Docklands which is within walking distance of all major city centre universities and colleges, public transport and city amenities.

Lansdowne Place

Lansdowne Place

Dublin

Installation: Supply & installation of all the Passive Fire Protection to the site.

Main Contractors: J.J. Rhatigan

Client: Chartered Land

Description: PFP Ireland have been chosen by J.J. Rhatigan and Chartered Land to provide passive fire protection throughout one of Ireland’s most prestigious residential projects.

The scheme offers luxurious modern living inspired by London based interior architects, Goddard Littlefair, on their first residential project in Ireland.
Meticulous attention has been paid to the detailed design of the 215 units contained in seven pavilion-style buildings, in the heart of Ballsbridge ranging from spacious one bed units to four bedroom penthouses.

Marianella

Marianella

Dublin

Installation: Supply & installation of all the Passive Fire Protection to the site.

Main Contractors: Cairn Homes

Client: Cairn Homes

Description: Marianella is a brand new development of 2,3 & 4 bed houses and apartments perfectly located close to Rathgar village and a multitude of amenities including transport links, shops, restaurants, cafes, sports and leisure facilities; also parks including the exquisite Bushy Park and Palmerstown Park.

Hanover Quay

Hanover Quay

Dublin

Installation: Supply & installation of all the Passive Fire Protection to the site.

Main Contractors: Bennett Construction Ltd

Client: Ellier Developments Ltd

Description: The project consisted of 68 Apartments and 5700m of office space with 4 large retail units at the bottom facing the water. The project was built on the footprint of the old Gas works yard and resulted in 50,000 tonnes of contaminated soil being shipped to Germany for treatment from the excavation of the basement. This involved a complicated waterproofing exercise to avoid the existing contaminated water on site getting into the canal adjacent to the building. The project also consisted of a full landscaped courtyard and individual roof gardens on each building to highlight its location.

St Patrick’s College

Dublin

Installation: Supply & installation of internal and external intumescent basecoat, and of fire stopping throughout the whole site.

Main Contractors: JJ Rhatigan & Company

Client: Dublin City University

Description: The project involved the construction of a two storey (4500 sq.m) extension over the existing two storey / part three storey library building (Block F) at St. Patricks College, Drumcondra. The accommodation comprises a variety of teaching spaces, four lecture theatres, cellular and open plan offices, toilets and ancillary areas.

Elysian Tower

Elysian Tower

Cork

Installation: Service Penetration Seals to provide complete Protection in accordance with BS476. Air Tight Seals and testing.

Main Contractors: O’ Flynn Construction

Client: O’ Flynn Construction

Description: The Elysian Tower consists of a number of connected 6-8 storey buildings with a land mark 17 storey tower on the south west corner of the site. The tower is 68.28 metres to the top floor, making it the tallest storeyed building in the Republic of Ireland.

Georges Quay

George’s Quay

Dublin

Installation: Service Penetration Seals to provide complete Protection in accordance with BS476. Air Tight Seals and testing. Structural Steel fire proofing to 2hr rating.

Main Contractors: G&T Crampton

Client: Cosgrave Brothers

Description: 50,000sq.m of commercial office space in 4 separate buildings located beside the River Liffey opposite the Custom House, in the heart of Dublin’s central business district.

Spencer Docks

Spencer Docks

Dublin

Installation: Service Penetration Seals to provide complete Protection in accordance with BS476. Air Tight Sealing and testing. Structural Steel fire proofing to 2hr rating.

Main Contractors: John Sisk and Sons

Client: Treasury Holdings

Description: Spencer Dock’s 300,000sq m of distinctive offices and luxurious apartments are located in the heart of Dublin’s new central business district.

Dublin Airport T2

Dublin Airport Terminal 2

Dublin

Installation: Service Penetration Seals to provide complete Protection in accordance with BS476. Air Tight Seals and testing. Structural Steel fire proofing to 2hr rating. Cavity Barriers to external Cladding.

Main Contractors: Mace Group

Client: Dublin Airport Authorities

Description: Terminal 2, the new passenger terminal for Dublin Airport, opened in November 2010. This three-storey curvilinear building sits astride the main access road to Terminal One.

The T2 project included a new terminal building and a new departures gate area called Pier E, as well as a new energy efficient power plant. All departing passengers pass through an enlarged security screening area and into a spacious new departures lounge. Here they have access to new shops, cafes and restaurants.

Cork Civic Offices

Cork Civic Offices

Cork

Installation: Service Penetration Seals to provide complete Protection in accordance with BS476. Air Tight Seals and testing.

Main Contractors: Cleary Doyle Construction

Client: Cork City Council

Description: Faced in Italian marble, this four storey building, providing approximately 100.000sq ft (gross) of space providing modern offices and public space. In 2008 the building received 3 separate Awards from the Royal Institute of Architects in Ireland, for “Sustainability”, “Accessibility” and “Best Public Building”. The new facility now provides a state of the art, one stop shop incorporating all City Council Services.

Opera Lane

Opera Lane

Cork

Installation: Service Penetration Seals to provide complete Protection in accordance with BS476. Structural Steel fire proofing to 2hr rating.

Main Contractors: Bowen Construction

Client: O’ Callaghan Properties.

Description: At a cost of €500m it takes in two city centre blocks and ads in excess of 200,000sq ft to the retail capacity of the city, as well as 61 apartments.